Finish Flooring for the Tunnel and V-Berth

Finish flooring has been installed in the forward v-berth and ‘tunnel.’ Mahogany and maple tongue in groove. Small areas, but progress nonetheless. The tunnel floor has underneath, domestic water plumbing leading to the aft head. Also under the floor is the grey water discharge pump. All were leak tested before the floor was ultimately screwed down. These areas still need hardwood finish trim around the edges and transitions.

Tunnel flooring. Galley storage cabinets are above to the left.

Bow thruster is under this small amount of finish flooring in the v-berth.